Risk

Severity vs materiality

Two different measures that are routinely conflated: what a check is worth in the abstract, and how far this failure reaches in this account.

Currentengine 9.0.0Verified 2026-08-30

The distinction

SeverityMateriality
Assigned byThe scannerGovIntel, from observed evidence
Same for every customerYesNo
MeasuresThe check, in the abstractThis failure, in this account
InputsThe nature of the controlDistinct resources, region spread, account scope, reachability, control class
Used forScoring weight, the critical ceilingOrdering what leadership looks at first

Why conflating them misleads

A critical control failing on one resource in one region and a medium control failing on forty across five are not the same governance problem, and severity alone cannot tell them apart.

Reporting only severity puts the second one below the first, every time.

Where severity still leads

The score, through the weights. The critical ceiling, which caps the band whatever the reach.

Where materiality leads

The material risks page, and the ordering of the register. What leadership should look at first is a question about reach.

What neither is

Neither models business consequence. That requires facts about your organisation that the assessment never sees.